MINOR MENTAL DISORDERS IN TAIWANESE HEALTHCARE WORKERS AND THE ASSOCIATIONS WITH PSYCHOSOCIAL WORK CONDITIONS




Integrated Scheduling of Tasks and Preventive Maintenance Periods in a Parallel Machine Environment With Single Robot Server

In this study, the objective of minimizing makespan has been considered for a scheduling problem of identical parallel machines with a single server and unavailability constraints.The unavailability constraints correspond to preventive maintenance periods.In this study, the jobs and the maintenance periods are scheduled simultaneously.This scheduli

read more